177 Million Dollar Sewage Plant - Trickling Filter System My position is Assist RE (Resident Engineer) for the Electrical and Instrumentation systems. Responsible for RFIs, RFPs, FCOs, EI&C meetings, Submittal reviews and coordination with inspection, client, contractor and subcontractor. EI&C systems include 12KV switchgear, 480V system, lighting and power distribution system, Security System, FA system, Instrument and Control System including PLC system and Fiber optic system. |
Construction
Photos - OCSD Project
2008-2009
click on thumbnail photos to
see full size
|
P2-90 Trickling Filter Project |
|||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
| aerial photo 70% complete | Bubbler Panel measure level | Rebar and Conduit in Floor Elect Bldg |
72 inch pipe |
FO Media Converter | Conduit in floor of TF Pump Station | Model of project | Power and Comm Manholes |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||
| Cathodic Protection | Clarifier & ML Channel | Access Card Reader | Access Card Reader | TFPS Bldg | Fiber Optic cabinet | 480V switchgear by Square D | 480V switchgear by Square D |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
| 27/47 Relay | March 20, 2009 | MOV gate control for Solids Contact | Aerial View of Sewage Plant | Trickling Filter Project | typical size 1 starter | typical size 3 Starter | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| 300HP Motor |
12KV Swgr SQ D |
GE 750 Relay Protection | 1200A CB, 12KV | CT & PT | CB Relays | Power Logic | 2MVA Transf |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| Mini Powercenter | Inside RIO panel | Three RIO Panels | Inside RIO Panel | 200HP Blower | 200HP Blower | dry type Transf. | 2MVA Transf |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| 20KVA UPS | TF Media | TFPS Elect Rm | chem. bldg | battery charger | UPS | 2000KVA Transf | Ltg Panel |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| 2000KVA Transf. | NETA Swgr Testing | 30HP VFD | 125VDC batteries | site | MOV Valve Control | 12KV Swgr Test | 15KV cable pulling |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| 250W MH | Hi-Pot test CB | Hi-Pot testing Meter | cable in manhole | Cable Tension test machine | Cable Pulling Wheel | CB Testing | Crane Grounding |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| fireproop tape on 15KV cable | Cable Pulling Calc Witness test | Cable Pulling Witness test | Caustic Chem RIO Panel | Gate Control | Hypochloride Panel | 64KV DC Hi-Pot Test | 64KV DC Hi-Pot Test |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| bubbler panel for clarifier | Cable Pulling | VSD 300HP | acid test for 316SS | Oxygen Analyzer | 480V ATS 260A | Oxygen Analyzer | ultrasonic level transmitter |
![]() |
|
![]() |
![]() |
||||
| Multilin 369 motor protection | ProWorx32 PLC software | Chlorine Analyzer | Ultrasonic Flow Meter | ||||
| P2-66 Project | |||||||
![]() |
|
![]() |
![]() |
![]() |
![]() |
||
| 700HP Motor on P2-66 Proj | FCP Field Control Panel | Slew Gate Control | HPS Light Fixture | Gas Flow Transmitter | process flow diagram | ||
The two plants at OCSD have 5 gas generators producing 11MW of electricity at 12.47KV from the digester gas.